Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(deleted ADT)
(stepper 2 up)
Line 26: Line 26:
 
<!---------------------------------------------->
 
<!---------------------------------------------->
 
<!------------- Announcements ---------------->
 
<!------------- Announcements ---------------->
===== Stepper #2 AutoStep: Down =====
+
===== Stepper #2 AutoStep: UP =====
  +
One RMS motor and motor control board was replaced. I ran setup
We lost a motor in the mask aligner. Vendor is being contacted for repair.
 
  +
without error. The system is up and ready for your use.
The motor is scheduled to be delivered tomorrow morning. We will send
 
 
// [[User:John d|John d]] 12:50, 25 April 2018 (PDT)
out an email tomorrow when I have more information.
 
// [[User:John d|John d]] 16:45, 24 April 2018 (PDT)
 
   
 
===== PECVD#2 Upgrades in progress, Retraining required =====
 
===== PECVD#2 Upgrades in progress, Retraining required =====

Revision as of 12:50, 25 April 2018

UCSB NanoFab Announcements

Stepper #2 AutoStep: UP

One RMS motor and motor control board was replaced. I ran setup without error. The system is up and ready for your use. // John d 12:50, 25 April 2018 (PDT)

PECVD#2 Upgrades in progress, Retraining required

Plasmatherm is still upgrading the system software. The user interface will be completely different from the previous software, so all users will be disqualified and will need to be retrained to access the system through Signupmonkey. We will schedule training sessions once the upgrade is complete. // John d 12:51, 24 April 2018 (PDT)

RIE#5 Up

RIE #5 is up for use, including SiCl4. // John d 11:45, 20 April 2018 (PDT)

Cary 500 Down

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)