Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
m (edit comments)
Line 6: Line 6:
 
'''How to add new news items'''
 
'''How to add new news items'''
   
* Use level 5 heading for each item - they will show up as separate RSS items this way. (looks best on the Wiki homepage)
+
* Use level 5 heading for each item (5 equal signs) - they will show up as separate RSS items this way. (looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~, then after saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. Most recent date shows up at the top.
+
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
* "There are no announcements at this time." should be used to indicate when empty.
 
  +
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
* Use double-slash at start of new lines - makes display on the Samsung Display look a lot better.
 
 
* "There are no announcements at this time." should be used when empty.
  +
  +
  +
Example of a new post:
  +
  +
===== NanoFab making LN2 icecream =====
  +
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// ~~~~
  +
  +
  +
(end of example)
  +
The ~~~~ will be replaced with your username & timestamp after you submit the post.
  +
 
-->
 
-->
 
<!---------------------------------------------->
 
<!---------------------------------------------->

Revision as of 21:31, 29 March 2018

UCSB NanoFab Announcements

ASML: Up

Leveling Error Fixed. // thibeault 09:00, 29 March 2018 (PDT)

IBD is up

Power supply replaced, system is up. // John d 21:09, 28 March 2018 (PDT)

ADT Dicing Saw: Intermittent Software Issue

One of the DB files keeps getting corrupted. We've restored the system back to the backup created yesterday afternoon and the saw is up and running. Looking into a longer term fix. If you created a new recipe within the last 5 days you may need to re-create it. // John d 21:43, 27 March 2018 (PDT)

EBeam #4: Re-Training Required

The upgrade is complete and working well. All users will be required to be trained again. The high voltage, sweep and turret controls are all new. // John d 12:13, 26 March 2018 (PDT)

PECVD #2: UP with possible High Particulates

We are still experiencing high particle counts in the Advanced Vacuum PECVD process. Our next step is to replace the Silane MFC. I will update you once I have a lead time on the new MFC. Most likely it will take several weeks to receive. Until then, the system is operational and can be used if your process is not sensitive to high particle counts. // Posted: 13:22, 19 March 2018 (PDT)

Gasonics: Up

The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned. // Posted: 10:14, 12 February 2018 (PST)

Cary 500 Down

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)