Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(→‎EBeam #4: Down for Upgrades: title = UP, retraining)
m (→‎EBeam #4: Re-Training needed: needed --> required)
Line 17: Line 17:
 
// [[User:John d|John d]] 12:12, 26 March 2018 (PDT)
 
// [[User:John d|John d]] 12:12, 26 March 2018 (PDT)
   
===== EBeam #4: Re-Training needed =====
+
===== EBeam #4: Re-Training Required =====
 
The upgrade is complete and working well. All users will be required
 
The upgrade is complete and working well. All users will be required
 
to be trained again. The high voltage, sweep and turret controls are
 
to be trained again. The high voltage, sweep and turret controls are

Revision as of 12:14, 26 March 2018

UCSB NanoFab Announcements

ADT Dicing Saw: Fixed

Software fix by restoring from backup. If you created a new recipe within the last 5 days you may need to re-create it. // John d 12:12, 26 March 2018 (PDT)

EBeam #4: Re-Training Required

The upgrade is complete and working well. All users will be required to be trained again. The high voltage, sweep and turret controls are all new. // John d 12:13, 26 March 2018 (PDT)

PECVD #2: UP with possible High Particulates

We are still experiencing high particle counts in the Advanced Vacuum PECVD process. Our next step is to replace the Silane MFC. I will update you once I have a lead time on the new MFC. Most likely it will take several weeks to receive. Until then, the system is operational and can be used if your process is not sensitive to high particle counts. // Posted: 13:22, 19 March 2018 (PDT)

Gasonics: Up

The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to be repaired and returned. // Posted: 10:14, 12 February 2018 (PST)

Cary 500 Down

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)