Difference between revisions of "Template:Announcements"
Jump to navigation
Jump to search
(jeol sem up) |
m (sig fix) |
||
Line 17: | Line 17: | ||
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST) |
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST) |
||
− | ===== Gasonics Up ===== |
+ | ===== Gasonics: Up ===== |
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned. |
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned. |
||
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST) |
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST) |
||
− | ===== ASML Up ===== |
+ | ===== ASML: Up ===== |
ASML Stepper #3 periodic maintenance is complete. System is ready for use. |
ASML Stepper #3 periodic maintenance is complete. System is ready for use. |
||
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST) |
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST) |
||
Line 27: | Line 27: | ||
===== JEOL SEM #2: Up ===== |
===== JEOL SEM #2: Up ===== |
||
System is up, gate valve fixed. |
System is up, gate valve fixed. |
||
− | // [[User:John d| |
+ | // [[User:John d|Posted:]] 16:01, 13 February 2018 (PST) |
===== Cary 500 Down ===== |
===== Cary 500 Down ===== |
Revision as of 17:01, 13 February 2018
UCSB NanoFab Announcements
Announcements
There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)
Gasonics: Up
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned. // Posted: 10:14, 12 February 2018 (PST)
ASML: Up
ASML Stepper #3 periodic maintenance is complete. System is ready for use. // Posted: 18:52, 10 February 2018 (PST)
JEOL SEM #2: Up
System is up, gate valve fixed. // Posted: 16:01, 13 February 2018 (PST)
Cary 500 Down
UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)