Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(jeol sem up)
m (sig fix)
Line 17: Line 17:
 
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST)
 
// [[User:John d|Posted: ]] 09:58, 4 January 2018 (PST)
   
===== Gasonics Up =====
+
===== Gasonics: Up =====
 
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned.
 
The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned.
 
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)
 
// [[User:John d|Posted:]] 10:14, 12 February 2018 (PST)
   
===== ASML Up =====
+
===== ASML: Up =====
 
ASML Stepper #3 periodic maintenance is complete. System is ready for use.
 
ASML Stepper #3 periodic maintenance is complete. System is ready for use.
 
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST)
 
// [[User:John d|Posted:]] 18:52, 10 February 2018 (PST)
Line 27: Line 27:
 
===== JEOL SEM #2: Up =====
 
===== JEOL SEM #2: Up =====
 
System is up, gate valve fixed.
 
System is up, gate valve fixed.
// [[User:John d|John d]] ([[User talk:John d|talk]]) 16:01, 13 February 2018 (PST)
+
// [[User:John d|Posted:]] 16:01, 13 February 2018 (PST)
   
 
===== Cary 500 Down =====
 
===== Cary 500 Down =====

Revision as of 17:01, 13 February 2018

UCSB NanoFab Announcements

Announcements

There are no general announcements at this time. // Posted: 09:58, 4 January 2018 (PST)

Gasonics: Up

The process chamber mechanical pump is struggling to make base pressure but the system is able to successfully run. We are waiting for the replacement pump to repaired and returned. // Posted: 10:14, 12 February 2018 (PST)

ASML: Up

ASML Stepper #3 periodic maintenance is complete. System is ready for use. // Posted: 18:52, 10 February 2018 (PST)

JEOL SEM #2: Up

System is up, gate valve fixed. // Posted: 16:01, 13 February 2018 (PST)

Cary 500 Down

UV-Vis Detector Failure. Tool is able to used from 600nm and up. Looking into replacement options. // Posted: 13:47, 12 February 2018 (PST)