Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(deleted JEOL talk)
(ASML PM Complete)
Line 14: Line 14:
 
<!------------- Equipment Status ---------------->
 
<!------------- Equipment Status ---------------->
   
===== ASML Maintenance: Nov 1st-4th =====
+
===== ASML UP =====
  +
PM complete, system is up.
ASML Engineers will be on site for the periodic maintenance from November 1 through November 4.
 
 
// [[User:John d|John d]] 13:25, 4 November 2022 (PDT)
System will be down during this time.
 
// [[User:John d|John d]] 08:47, 29 October 2022 (PDT)
 
 
===== SEM#1: UP =====
 
Alignments complete, the tool is available to use.
 
// [[User:John d|John d]] 16:25, 1 November 2022 (PDT)
 
   
 
===== Au Plating: DOWN =====
 
===== Au Plating: DOWN =====

Revision as of 13:25, 4 November 2022

Important Announcements


ASML UP

PM complete, system is up. // John d 13:25, 4 November 2022 (PDT)

Au Plating: DOWN

Bath damaged, system is down for repair. // John d 08:48, 27 October 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

MLA 150 Software Revision

The MLA has new software - make sure to see the updated operating procedures. In addition, any users running the “small” substrate templates (<12mm samples) must be absolutely sure that “Pneumatic Autofocus” is disabled or risk crashing the optics - please see email and note at the tool for details. // John d 16:27, 17 October 2022 (PDT)

ASML Up; Network status

Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Report syncing is not yet working. JobCreator is working with staff intervention, as local scripts are still being written + tested.

// John d 15:44, 29 September 2022 (PDT)

NanoFab Job Openings

The NanoFab has current job openings, apply at: NanoFab Job Postings

// John d 23:55, 4 October 2022 (PDT)