Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(delete stepper 2 up)
Line 17: Line 17:
 
The field service engineer has finished with the alignments and the system is ready to use.
 
The field service engineer has finished with the alignments and the system is ready to use.
 
// [[User:John d|John d]] 14:27, 21 September 2022 (PDT)
 
// [[User:John d|John d]] 14:27, 21 September 2022 (PDT)
 
===== Stepper #2 (Autostep): UP =====
 
System up. Please note the maintenance schedule this week. // [[User:John d|John d]] 10:54, 26 September 2022 (PDT)
 
   
 
===== E-Beam#2: Heater Down =====
 
===== E-Beam#2: Heater Down =====

Revision as of 08:28, 28 September 2022

Important Announcements


SEM#1 (FEI): UP

The field service engineer has finished with the alignments and the system is ready to use. // John d 14:27, 21 September 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

Stepper#2 (AutoStep): UP

The maintenance tasks on the tool have been completed and the system is now available for use.

// John d 08:28, 28 September 2022 (PDT)

GCA 6300 Service

GCA 6300 will not be available for use while it is undergoing maintenance activities on 9-28-22 & 9-29-22.

// John d 08:33, 19 September 2022 (PDT)

MLA 150 Service & Software Revision

The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)

ASML Up; Network status

Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Reports are now syncing. JobCreator is working but local scripts are still being written + tested.

// John d 01:53, 17 September 2022 (PDT)