Difference between revisions of "Template:Announcements"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(AutoStep up.)
Line 25: Line 25:
 
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
 
// [[User:John d|John d]] 15:40, 21 September 2022 (PDT)
   
===== GCA AutoStep Service =====
+
===== Stepper#2 (AutoStep): UP =====
  +
The maintenance tasks on the tool have been completed and the system is now available for use.
Stepper #2 (GCA AutoStep200) will be unavailable for use while maintenance tasks are performed on the following dates: 9-26-22 8am to 9-27-22 5pm.
 
   
// [[User:John d|John d]] 08:30, 19 September 2022 (PDT)
+
// [[User:John d|John d]] 08:28, 28 September 2022 (PDT)
   
 
===== GCA 6300 Service =====
 
===== GCA 6300 Service =====

Revision as of 08:28, 28 September 2022

Important Announcements


SEM#1 (FEI): UP

The field service engineer has finished with the alignments and the system is ready to use. // John d 14:27, 21 September 2022 (PDT)

Stepper #2 (Autostep): UP

System up. Please note the maintenance schedule this week. // John d 10:54, 26 September 2022 (PDT)

E-Beam#2: Heater Down

EB2 Heated Processing is down // John d 15:40, 21 September 2022 (PDT)

Stepper#2 (AutoStep): UP

The maintenance tasks on the tool have been completed and the system is now available for use.

// John d 08:28, 28 September 2022 (PDT)

GCA 6300 Service

GCA 6300 will not be available for use while it is undergoing maintenance activities on 9-28-22 & 9-29-22.

// John d 08:33, 19 September 2022 (PDT)

MLA 150 Service & Software Revision

The MLA will be down beginning the evening of Monday October 3rd and should be back up sometime Friday October 7th. // L Sawyer 13:32, 31 August 2022 (PDT)

ASML Up; Network status

Nanofiles sync & JobCreator functionality is in the process of being restored. Batch_Reports are now syncing. JobCreator is working but local scripts are still being written + tested.

// John d 01:53, 17 September 2022 (PDT)