Difference between revisions of "Template:Announcements"
(deleted ASML msgs, MLA150 msg) |
Mehalana v (talk | contribs) |
||
(214 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
<startfeed /> |
<startfeed /> |
||
+ | =====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10===== |
||
− | <!--feedBurner name="UCSBNanofab-Announcements" /--> |
||
+ | We are postponing the Maintenance date to May 6th – 10th. |
||
− | <!-- Description of the RSS feed --> |
||
+ | On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time. |
||
− | '''''Important Announcements''''' |
||
⚫ | |||
− | <!-- |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
− | <!------------- Equipment Status ----------------> |
||
− | ===== |
+ | =====ALD Oxford UP===== |
+ | The tool is working properly at this time and is now available for use. Thank you for your patience in regard to this matter. |
||
− | Fri Nov 11th is a UCSB Holiday. Staff will not be on site. |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT) |
− | ===== |
+ | =====DI and Waste Water systems===== |
+ | DI and Waste Water systems will be down for upgrade April 5th and 6th. |
||
− | Replacement parts are scheduled to ship from Austria next week. We'll update once I have tracking info. |
||
− | // |
+ | //[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT) |
+ | =====ICP1 Down===== |
||
+ | The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. |
||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST) |
||
− | ===== |
+ | =====Job Opening: Process Engineer===== |
⚫ | |||
− | A service engineer will be here starting at noon (11/8) to do preventative maintenance. Service should be completed on Friday (11/11) around 1pm. |
||
− | //[[User:Hopkins a|Hopkins a]] 08:12, 8 November 2022 (PST) |
||
⚫ | |||
− | ===== Au Plating: DOWN ===== |
||
− | Bath damaged, system is down for repair. |
||
⚫ | |||
− | ===== |
+ | =====Lab Access Changes: Symmetry App===== |
+ | Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''. |
||
− | EB2 Heated Processing is down |
||
− | // [[User:John d|John d]] |
+ | // [[User:John d|John d]] 13:49, 7 November 2023 (PST) |
− | ===== |
+ | =====Wafer Bonder, (Suss SB6-8E)===== |
+ | SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. |
||
⚫ | |||
+ | //[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST) |
||
⚫ | |||
⚫ | |||
⚫ | |||
− | |||
⚫ | |||
− | <!---------- end of Equipment Status ------------> |
||
⚫ | |||
− | <!----------------------------------------------> |
||
⚫ | |||
⚫ | |||
⚫ | |||
<endfeed /> |
<endfeed /> |
||
<noinclude>[[Category:Templates]]</noinclude> |
<noinclude>[[Category:Templates]]</noinclude> |
||
<!-------------------------------------------- |
<!-------------------------------------------- |
||
− | |||
− | |||
− | |||
− | |||
====== HOW TO ADD ITEMS ====== |
====== HOW TO ADD ITEMS ====== |
||
− | |||
* You can copy/paste the example below for a new news item. |
* You can copy/paste the example below for a new news item. |
||
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage) |
||
− | * You must add a user signature at the end of each post via four tildes: |
+ | * You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines. |
||
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link. |
||
Line 65: | Line 56: | ||
===== NanoFab making LN2 icecream ===== |
===== NanoFab making LN2 icecream ===== |
||
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
Tomorrow the NanoFab will be serving liquid nitrogen ice cream. |
||
+ | // [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) |
||
− | // ~~~~ |
||
************* (end of example) ************** |
************* (end of example) ************** |
||
− | The |
+ | The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post. |
----------------------------------------------> |
----------------------------------------------> |
Latest revision as of 20:15, 10 April 2024
Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10
We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
//Vraj Mehalana 09:42, 5 April 2024 (PDT)
ALD Oxford UP
The tool is working properly at this time and is now available for use. Thank you for your patience in regard to this matter. //Vraj Mehalana 13:48, 19 March 2024 (PDT)
DI and Waste Water systems
DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)
ICP1 Down
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)
Job Opening: Process Engineer
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.
//Demis D. John 14:52, 30 October 2023 (PDT)
Lab Access Changes: Symmetry App
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)
Wafer Bonder, (Suss SB6-8E)
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)