=====Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10=====
<!--feedBurner name="UCSBNanofab-Announcements" /-->
 
  +
We are postponing the Maintenance date to May 6th – 10th.
<!-- Description of the RSS feed -->
 
  +
On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.
'''''Equipment Status'''''
 
----
 
<!--
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
 
   
 
//[[User:Mehalana v|Vraj Mehalana]] 09:42, 5 April 2024 (PDT)
Please use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
 
Use FOUR tilde's to insert your signature at the end of your post: ~~~~
 
-->
 
<!---------------------------------------------->
 
<!------------- Equipment Status ---------------->
 
   
===== Lab Closed 5a–7am on 8/26 =====
+
=====ALD Oxford UP=====
  +
The tool is working properly at this time and is now available for use. Thank you for your patience in regard to this matter.
Campus facilities need to fix a gross leak on our compressed air system. The work is scheduled for Thursday morning (8/26) from 5am to 7am. During this time no users will be allowed in the lab.
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 13:48, 19 March 2024 (PDT)
   
  +
=====DI and Waste Water systems=====
An email will go out once the lab is back online. Please plan accordingly.
 
  +
DI and Waste Water systems will be down for upgrade April 5th and 6th.
[[User:John d|John d]] 15:03, 23 August 2021 (PDT)
 
  +
//[[User:Mehalana v|Vraj Mehalana]] 11:55, 18 March 2024 (PDT)
  +
=====ICP1 Down=====
  +
The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:17, 1 March 2024 (PST)
   
  +
=====Job Opening: Process Engineer=====
===== Building Controls Update next Friday (8/27) =====
 
  +
The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the [https://wiki.nanofab.ucsb.edu/wiki/Nanofab_Job_Postings NanoFab Job Openings page] for details.
Campus facilities will be doing a firmware update on the building controls at 7am. No disruption in operation is expected but there is a slight chance of a small change in cleanroom temperature and/or pressure. Please plan accordingly.
 
[[User:Hopkins a|Hopkins a]] 16:52, 19 August 2021 (PDT)
 
   
  +
//[[User:John d|Demis D. John]] 14:52, 30 October 2023 (PDT)
===== New COVID Protocols =====
 
All facility users and visitors are now required to have masks on while indoors in shared spaces. This includes shared offices, hallways/corridors, and all shared laboratory spaces. Masks will be worn in all laboratories at all times and in all shared office spaces at all times.
 
   
  +
=====Lab Access Changes: Symmetry App=====
This direction applies to all vaccinated and non-vaccinated persons.
 
  +
Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. '''IMPORTANT''': check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled '''''"Invitation to Access Symmetry App"'''''.
 
// [[User:John d|John d]] 13:49, 7 November 2023 (PST)
   
  +
=====Wafer Bonder, (Suss SB6-8E)=====
Outdoor policies remain unchanged
 
  +
SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date.
  +
//[[User:Mehalana v|Vraj Mehalana]] 14:23, 13 December 2023 (PST)
   
 
<!--
Surgical style masks or KN95 masks are appropriate for cleanroom use. Cloth masks may be used in non-cleanroom spaces.
 
 
SEE THE BOTTOM OF THIS PAGE FOR DETAILED INSTRUCTIONS ON ADDING NEWS ITEMS.
[[User:Hopkins a|Hopkins a]] 08:14, 6 August 2021 (PDT)
 
  +
In order for your post to show up correctly, you need to:
 
 
>> Use FIVE equal-signs for the Title's heading level. eg.: ===== my post =====
===== Weekly Testing strongly urged for UCSB Students/Staff =====
 
 
>> Use two slashes // and FOUR tilde's to insert your signature at the end of your post: //~~~~
Free weekly COVID testing is available to UCSB Staff, Faculty and Students. UCSB employees are strongly urged to sign up for weekly testing, which takes only minutes, is administered on-campus and is free of charge.
 
 
-->
 
 
<!---------DO NOT EDIT BELOW THIS LINE----------->
Weekly recurring appointments can be made at the Student Health website:
 
* Log on to the [https://studenthealthoc.sa.ucsb.edu/login_dualauthentication.aspx '''UCSB Testing Patient Portal'''] using your UCSB NetID and password.
 
 
The Chancellor's [https://chancellor.ucsb.edu/memos/2020-10-15-recommended-covid-19-asymptomatic-campus-testing-program-faculty-staff-and memo to campus with details can be found here].
 
// [[User:John d|John d]] 06:20, 16 November 2020 (PST)
 
 
===== NanoFab COVID Protocols =====
 
Following guidelines provided by our Office of Research, the UCSB Nanofabrication Facility is open only for limited/authorized use for critical activity at this time.
 
 
Contact the [[Brian Thibeault|Lab Director]] for more information.
 
 
''The most recent COVID Protocols can be found at '''[[COVID-19_User_Policies]]'''.''
 
 
// [[User:John d|John d]] 15:00, 19 July 2020 (PDT)
 
 
 
<!---------- end of Equipment Status ------------>
 
<!---------------------------------------------->
 
 
<endfeed />
 
<endfeed />
 
<noinclude>[[Category:Templates]]</noinclude>
 
<noinclude>[[Category:Templates]]</noinclude>
 
<!--------------------------------------------
 
<!--------------------------------------------
 
====== HOW TO ADD ITEMS ======
 
 
 
 
====== HOW TO ADD NEWS ITEMS ======
 
 
 
* You can copy/paste the example below for a new news item.
 
* You can copy/paste the example below for a new news item.
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
 
* Use level 5 heading for each item (5 equal signs surrounding the title) - they will show up as separate RSS items this way. (This looks best on the Wiki homepage)
* You must add a user signature at the end of each post via four tildes: ~~~~. Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
+
* You must add a user signature at the end of each post via four tildes: [[User:Silva|Silva]] 13:26, 4 February 2023 (PST). Required for the RSS plugin to determine the timestamp, or else post goes to the end of the RSS feed.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Use double-slash: // at start of new lines - makes display on the Samsung Display look a lot better, since it strips newlines.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Optional: After saving the page, delete the name after the two dashes "--" and delete the "[[(talk)...]]" link.
 
* Please use "There are no announcements at this time." if the announcements are empty.
 
* Please use "There are no announcements at this time." if the announcements are empty.
   
* URL to the RSS feed via FeedBurner (for Samsung display): http://feeds.feedburner.com/UCSBNanofab-Announcements?format=xml
+
* URL to the RSS feed via FeedBurner (for Samsung display): http://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
* URL to the RSS feed directly from Wiki: https://www.nanotech.ucsb.edu/wiki/index.php?title=Template:Announcements&action=feed&feed=rss
+
* URL to the RSS feed directly from Wiki: https://wiki.nanotech.ucsb.edu/w/index.php?title=Template:Announcements&action=feed&feed=rss
   
   
Line 78: Line 56:
 
===== NanoFab making LN2 icecream =====
 
===== NanoFab making LN2 icecream =====
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
 
Tomorrow the NanoFab will be serving liquid nitrogen ice cream.
  +
// [[User:Silva|Silva]] 13:26, 4 February 2023 (PST)
// ~~~~
 
   
 
************* (end of example) **************
 
************* (end of example) **************
The ~~~~ will be replaced with your username & timestamp after you submit the post.
+
The [[User:Silva|Silva]] 13:26, 4 February 2023 (PST) will be replaced with your username & timestamp after you submit the post.
 
---------------------------------------------->
 
---------------------------------------------->

Latest revision as of 20:15, 10 April 2024

Stepper #3 (ASML DUV) - PM Moved to 5/6 – 5/10

We are postponing the Maintenance date to May 6th – 10th. On the week of May 6th, ASML Engineers will be performing preventative maintenance, please plan your work around the tool being down at that time.

//Vraj Mehalana 09:42, 5 April 2024 (PDT)

ALD Oxford UP

The tool is working properly at this time and is now available for use. Thank you for your patience in regard to this matter. //Vraj Mehalana 13:48, 19 March 2024 (PDT)

DI and Waste Water systems

DI and Waste Water systems will be down for upgrade April 5th and 6th. //Vraj Mehalana 11:55, 18 March 2024 (PDT)

ICP1 Down

The board we were waiting on arrived, but it did not resolve the tool issue. We are working with Panasonic on the next steps. //Vraj Mehalana 14:17, 1 March 2024 (PST)

Job Opening: Process Engineer

The Nanofab has a current job opening for a Process/Wafer-Fab Engineer, see the NanoFab Job Openings page for details.

//Demis D. John 14:52, 30 October 2023 (PDT)

Lab Access Changes: Symmetry App

Card/Iris scanner access is still currently enabled. However we will be moving to a smartphone-based access system. IMPORTANT: check your email to setup the new smartphone access system, so you will be ready when we switch to the new system. Look for an email titled "Invitation to Access Symmetry App". // John d 13:49, 7 November 2023 (PST)

Wafer Bonder, (Suss SB6-8E)

SUSS aims to be on site in early February. We’ll will send out an email once I get confirmation for a specific date. //Vraj Mehalana 14:23, 13 December 2023 (PST)