Difference between revisions of "Nanofab Staff Internal Pages"

From UCSB Nanofab Wiki
Jump to navigation Jump to search
(link to ASML dicing guide prog.)
(Removing IT: In pprogess...)
 
(40 intermediate revisions by 2 users not shown)
Line 1: Line 1:
Pages intended for NanoFab Staff.
+
This page is intended for NanoFab Staff, internal.
   
 
==Equipment Group==
== Video Training procedures ==
 
* [[Video Training - Introduction (Internal)|Intro]]: general overview of the recording and online training methods.
 
* Recording your Training Video:
 
** Synchronized recording for minimal-effort recordings.
 
** [[GoPro Hero8 Black (Internal)|GoPro Hero8 Black]] - used for first-person recording.
 
** [[Sony Handycam - Record your Training (Internal)|Sony Handycam]] - used for recording computer screens
 
** [[Video Training: Recording a Windows 10 Computer Screen|Windows Screen-Recording]] - for wide-screen monitors
 
* [[Video Training: Editing on the Video Training Workstation|Upload/Edit your files on the Video Editing workstation]]
 
* [[Video Training: Uploading to GauchoCast/Panopto (Internal)|Uploading your files to GauchoCast/Panopto]]
 
* [[Video Training: Hosting with Zoom and GacuhoCast/Panopto|Hosting a Video Training with Zoom and GacuhoCast/Panopto]]
 
   
  +
*[[Equipment Group - Video Training Procedures|Video Training Procedures]] - How to record, edit and publish a video training.
== Process Group ==
 
[[Process Group - Lab Stocking/Supplies Tasks|Lab Stocking/Supplies Tasks]] - assigned tasks for in-lab stocking/waste duties
 
   
  +
==Process Group==
[[ASML Stepper 3 Dicing Guide Programming|ASML Dicing Guide Programming]] - how to print dicing guides on a wafer
 
  +
  +
*[[Process Group - Remote Fabrication Jobs|'''Job Tracking''']] - pages to organize and track our remote 'fab service jobs
  +
*[[Process Group - Billing Instructions|Billing Instructions (RechargeApp)]] - info on entering billing into RechargeApp.
  +
**''Includes [[Process Group - Billing Instructions#Supplies Costs|Supplies Costs]].''
 
*[[ASML Stepper 3 Dicing Guide Programming|ASML Dicing Guide Programming]] - how to print dicing guides on a wafer
  +
*[[Process Group - Process Control Data|Process Control Data]] - all the links to process calibration/repeatability data in one place.
  +
  +
==NanoFab IT==
  +
''Computers, Networks, FTP/File-Sync etc.''
  +
  +
*Instructions+Procedures can be found in ''GDrive Share Drive [https://drive.google.com/drive/u/0/folders/0AAqKJ7erJXTnUk9PVA NanoFab IT]''
  +
  +
*'''Signupmonkey'''
  +
**Failover
  +
**Restart
  +
**Restore
  +
*'''RechargeApp'''
  +
**Failover
  +
**Restart
  +
**Restore
  +
*'''Nanofabserver2'''
  +
**Restart
  +
**Restore
  +
*'''NanoFab Wiki'''
  +
**Restart
  +
**Restore
  +
*'''NanoFab Server UPS'''
  +
**Battery Test<br />
  +
  +
==Administration==
  +
  +
*[[Nanofab New User Onboarding|Nanofab New User Onboarding - UCSB Users]] - To-do list for new internal-UCSB users
  +
*[[Nanofab New User Onboarding - External Users]] - To-do list for new External users traveling from elsewhere
  +
  +
==Useful UCSB Pages==
  +
  +
*[https://www.dfss.ucsb.edu/facilities-management/work-request Facilities Work Requests] - Here's where you report facilities repair requests, like replacing light bulbs, building problems (doors, elevators) etc.
  +
  +
==Old / Defunct==
  +
''Old pages we don't use on the Wiki anymore, but are kept for possible utility later on.''
  +
 
*[[Process Group - Lab Stocking/Supplies Tasks|Lab Stocking/Supplies Tasks]] - Not needed anymore 2021-02
  +
*[[Old Deposition Data - 2021-12-15]] - removed from main Dep pages
  +
**New [[Old Deposition Data - NastaziaM 2021-11-22|Deposition Data - NastaziaM 2021-11-22]] - combo of old & new links. Can probably be safely deleted.
  +
**[[Deposition Data - temporary 2021-12-15|Deposition Data - temporary 2021-12-15]] - staging for new links, copied to PECVD/Sputter Recipes pages on 2021-12-15. This can probably be safely deleted.

Latest revision as of 16:10, 9 April 2024

This page is intended for NanoFab Staff, internal.

Equipment Group

Process Group

NanoFab IT

Computers, Networks, FTP/File-Sync etc.

  • Instructions+Procedures can be found in GDrive Share Drive NanoFab IT
  • Signupmonkey
    • Failover
    • Restart
    • Restore
  • RechargeApp
    • Failover
    • Restart
    • Restore
  • Nanofabserver2
    • Restart
    • Restore
  • NanoFab Wiki
    • Restart
    • Restore
  • NanoFab Server UPS
    • Battery Test

Administration

Useful UCSB Pages

  • Facilities Work Requests - Here's where you report facilities repair requests, like replacing light bulbs, building problems (doors, elevators) etc.

Old / Defunct

Old pages we don't use on the Wiki anymore, but are kept for possible utility later on.