Logitech WBS7 - Procedure for Wax Mounting with bulk Crystalbond Stick

From UCSB Nanofab Wiki
Revision as of 10:09, 11 August 2020 by John d (talk | contribs) (unload step)
Jump to navigation Jump to search
Contributed by Miguel Daal, Mazin Group  -- 2018-04-24

Procedure for wax-mounting a 100mm Silicon wafer to another 100mm silicon carrier wafer.

  • Place 4" polished handle wafer on hotplate set to 120°C
  • Apply approximately 1" diameter  size puddle of crystal bond wax from the stick. Then remove from hotplate. and cool. 
  • Align work wafer on top of handle wafer placed on the glass plate of the Logitech bonder. Align the two wafers' flats.   Place 6" piece of filter paper on top of work wafer. 
  • Turn on Logitech bonder (bottom right of machine chassis) 
  • Close and lock Logitech bonder hatch.
  • On front panel of  Logitech bonder, confirm that Applied Pressure gauge is set to 5 psi.
  • Enter the process settings:
    • [setup] -> [Temp]
      • Bonding: 120°C      
      • Endpoint: 65°C
      • Offset: 20°C           
      • Units: C
    • [setup] -> [Vac Thres]
      • Proceed if Below: 2.4E+01 mBar
      • Abort if Below: 3.2E+01 mBar
    • [setup] -> [Process Control]
      • Process: Heat + Outgas
      • Soak: 5min
      • Bond: 15min
      • O.G. Limit: 20min
      • P.P. del: 1min
    • [Setup] -> [Heads]
      • Head 1 On
  • Start Process: [Process] -> [Start]
  • Process takes about 45min
    • Unload when it displays Status: Ready
  • Turn off Logitech bonder (bottom right of machine chassis)